Category Archives: Bridge Design Economics

Instant Steel Bridge: Accelerated Bridge Construction With Steel

A remarkable feat took place recently in Boston, MA.  A bridge, owned by the The Massachusetts Department of Transportation, that would “normally involve two years of detours and frustration for local drivers” (according to an article in the New York … Continue reading

Posted in Accelerated Bridge Design and Construction, Bridge Design Economics, Installation, Prefabricated Bridges, Short Span Steel Bridge Alliance | Tagged , , | Leave a comment

Three Myths.. and the Reality… of Steel Bridges

There are a lot of “myths”or misconceptions surrounding the use of steel in bridge construction. These myths often arise out of past experience and don’t take into account changes in technology, improvements in materials and products or updated design and … Continue reading

Posted in Bridge Design Economics, Modular Bridges, Prefabricated Bridges, Short Span Bridges, Steel Bridges, Uncategorized | Tagged , , , | Leave a comment